Need help.
I have 2 columns, on the computer, they are located horizontally.
In the mobile version they are arranged vertically, one above the other.
It is necessary to do so in the mobile version of the site, right column located ON the left(by default it is under it).
It is possible to do by means of wpbakery page builder, so you don't have to go into code, because I do not rummage in it?